EcoCheckA BeevR product
CBAM service · experts + platform

CBAM advisory & reporting for exporters

Your EU customer is asking for embedded-emissions data? EcoCheck experts take you from CN codes and plant data to the importer data pack — calculated under Regulation (EU) 2025/2547, with a verifier-ready file.

✓ Expert-led✓ SEE on the EcoCheck platform✓ Verification-ready data
CBAM 2026 — actual SEE vs. default
tCO₂e per tonne · Impl. Reg. 2025/2547, 2025/2621 (as corrected by 2026/1740)
Sample report
Hot-rolled coil 7208 39 00
Actual
1,76
Default + 10 %
2,585
Rebar 7214 20 00
Actual
1,82
Default + 10 %
2,585
Aluminium profiles 7604 29 10
Actual
1,4
Default + 10 %
2,222
Actual SEE values are illustrative; defaults are the official Viet Nam values + 10 % mark-up for 2026.
In short

What is CBAM?

CBAM (Carbon Border Adjustment Mechanism) is the EU rule that puts a carbon price on certain imports, matching what EU producers pay under the EU Emissions Trading System (EU ETS).

Since 1/1/2026 CBAM is in its definitive, paying phase: EU importers declare embedded emissions every year and buy certificates; the 2026 declaration is due by 30/9/2027. Vietnamese companies do not file it, but must give their customers the SEE of each product. Without verified actual data the importer has to use EU default values — usually higher, and more expensive.

Key dates

  • 1/1/2026 — definitive period, 10 % mark-up
  • 2/2027 — CBAM certificates on sale
  • 30/9/2027 — declaration and surrender for 2026 imports
  • 2027: 20 % mark-up · from 2028: 30 %
  • Importers under 50 t/year are exempt
Scope

Export sectors covered by CBAM

Six groups of goods are covered from 2026. Not sure about your product? Check its 8-digit CN code in the CBAM calculator.

Cement

Clinker, Portland cement; indirect emissions count

Iron & steel

Billets, coil, bars, tubes, structures, fasteners

Aluminium

Unwrought aluminium, profiles, sheet, foil

Fertilisers

Urea, ammonia, compound fertilisers; indirect counts

Electricity

Electricity imported into the EU

Hydrogen

Hydrogen

Common hurdles

The challenges for Vietnamese exporters

Complex emissions reporting

Emissions must be split by process, CN code, precursor and electricity — unlike a regular inventory.

Easy to get wrong

A wrong unit, factor or CN code sends your customer back to costlier default values.

Data must be traceable

Importers and verifiers need the source, factor and evidence behind every number.

Little in-house experience

EU rules are new and keep changing; few companies have CBAM staff in-house.

What you get

Why use the EcoCheck CBAM service

  • Exactly what EU importers need: SEE per CN code under Regulation (EU) 2025/2547, with a verifier file.
  • Experts with you end to end: product scope, plant data, the customer data pack.
  • The EcoCheck platform calculates, compares with EU defaults and exports the template when the customer asks.
  • Every number traceable: factor, unit and evidence stored with the data.
  • An edge in quotes: reliable actual data lowers your EU customer’s certificate bill versus default values.
10 % → 30 %
mark-up on default values, 2026 → 2028
30/9/2027
first CBAM declaration deadline for importers
2025/2547
the SEE method EcoCheck applies
6 sectors
of goods covered from 2026

How the EcoCheck CBAM service works

Six steps, one expert team from intake until the data reaches your customer.

  1. 01

    Intake and first assessment

    We review your company, products, CN codes and existing data to fix the CBAM scope.

  2. 02

    Set-up on EcoCheck

    Installation profile, production processes, source streams and data flows set up for CBAM.

  3. 03

    Data collection

    Enter on the web, from Excel or via the AI assistant; EcoCheck normalises units and checks the inputs.

  4. 04

    SEE calculation

    Direct and indirect emissions under 2025/2547, compared with the EU default plus mark-up.

  5. 05

    Expert review

    Experts check the results, resolve every data warning and make sure it is complete before it goes out.

  6. 06

    CBAM report and export

    Finalise, export the importer data template and the verifier file.

Faster with AI

Prefer to do it yourself? Ask the AI assistant

Ask in ChatGPT or Claude: "CBAM cost of this 7208 39 00 shipment?", "build the CBAM data for my plant" — EcoCheck calculates with the official 2026 EU defaults.

ChatGPT / Claude · EcoCheck connected
What will 12,000 t of hot-rolled coil 7208 39 00 exported to the EU in 2026 cost in CBAM?
⚙ ecocheck.cbam_scope_check⚙ ecocheck.estimate_cbam_cost
EU default + 10 %2.585 t/t
Certificates14,991
Estimated cost≈ €1.23M
With actual data≈ €0.42–0.77M
Estimate under internal test assumptions: actual plant data can cut the importer cost by about 37–66 % (depending on the plant’s real emission intensity). Shall I build the CBAM data now?
Done in 27 s · internal test 10/2026

FAQ

Do Vietnamese exporters file the CBAM declaration themselves?

No. The EU importer (authorised CBAM declarant) files the declaration and buys the certificates. The Vietnamese producer supplies the specific embedded emissions (SEE) of each product, calculated with the EU method and backed by a verifiable file. Better data means a lower CBAM bill for your customer.

What if we have no actual data?

The importer must use the EU default value plus a mark-up: 10 % in 2026, 20 % in 2027, 30 % from 2028. For many steel and aluminium products this is well above the plant’s actual figure, which is why EU buyers ask for actual data in quotes.

What does the EcoCheck CBAM service include?

CN code and scope check, plant data collection (fuels, power, processes, precursors), SEE calculation under Implementing Regulation (EU) 2025/2547 on the EcoCheck platform, comparison with default values, expert review, importer data and the verifier file.

Can we reuse our Decree 06 inventory for CBAM?

Partly. EcoCheck imports Scope 1 fuel data from your inventory into CBAM without re-entry. CBAM also needs attribution per process and product, precursors and electricity — our experts work through that with you.

Get a quote for your facility

An EcoCheck expert will contact you within 24 business hours. Or message us on Zalo at 037.6869.366

Main need
Is the facility on the Decision 42 list?
Do you have 2025 electricity and fuel data?