2025-2026 Emission Quotas Allocated: What Businesses Must Do Now

Updated

The numbers you need to know

The approved total pilot greenhouse gas emission quota:

  • 2025: 243,082,392 tonnes CO₂e
  • 2026: 268,391,454 tonnes CO₂e

Allocated to 110 facilities comprising: 34 thermal power plants, 25 iron and steel production facilities, and 51 cement production facilities.

If your facility is on this list, the quota is no longer an abstract concept - it is a figure directly binding on your production operations and operating costs.

Stat cards: total pilot GHG emission quota 243,082,392 tonnes CO2e for 2025 and 268,391,454 tonnes CO2e for 2026, allocated to 110 facilities (34 thermal power plants, 25 iron and steel facilities, 51 cement facilities) under Decision 263/QD-TTg

Pilot emission quotas for 2025–2026 and the 110 facilities covered

What has changed

Previously, GHG inventory in Vietnam was largely a matter of reporting. From now on, each facility has a specific emissions cap, and exceeding the quota will carry legal and financial consequences.

More importantly, the Deputy Prime Minister has clearly stated the requirement: businesses must calculate their own figures, hire experts to assess them, and have an independent unit measure and certify the data. This means internal inventory figures are no longer sufficient - you need a data system robust enough to be submitted for third-party verification.

Implementation roadmap 

PhaseContent
2025-2026Pilot quota allocation; finalize the measurement - reporting - verification mechanism
2027-2028Ministries propose the list of covered facilities and annual quotas by June 30, 2027; quotas allocated before October 31, 2027. The domestic carbon exchange operates as a pilot until the end of 2028
From 2029Quota auctioning is introduced and rules on carbon credits and allowance trading are finalized; quotas for 2029-2030 allocated before October 31, 2029

There is not much time left to prepare. Facilities that have not built a systematic emissions tracking system will face the risk of non-compliance when the pilot phase ends and quota auctioning begins from 2029.

What do businesses need to prepare?

Based on the requirements in Decision 263/QD-TTg and Decree 119/2025/ND-CP, there are three core tasks that thermal power plants, steel facilities, and cement facilities need to carry out immediately:

1. Establish a real-time emissions data collection system The measurement data must be accurate enough to reconcile against the allocated quota, while also meeting international standards to be recognized under Vietnam's NDC commitments.

2. Standardize internal reporting processes From data collection → cross-checking → report preparation → preparing documentation for the independent verification unit. This process needs to run continuously, not just at year-end.

3. Track your position relative to the quota to proactively trade carbon credits Under Decree 119, facilities are permitted to trade emission quotas and carbon credits on the carbon exchange. Knowing where you stand relative to your quota - whether in surplus or deficit - is a prerequisite for making the right trading decisions at the right time.

Three steps for facilities with a pilot emission quota: 1) collect real-time emissions data accurate enough to reconcile with the quota; 2) standardize internal reporting from data collection to cross-checking, report preparation and verification documents; 3) track position against the quota to trade quotas and carbon credits under Decree 119/2025/ND-CP

Three core tasks for thermal power, steel and cement facilities under the pilot quota

EcoCheck helps you do exactly that

EcoCheck is a GHG inventory platform designed to fit Vietnam's legal framework, directly supporting the three groups of businesses within the pilot scope: thermal power, iron and steel, and cement.

With EcoCheck, businesses can:

  • Automatically inventory emissions using national and international standard emission factors (IPCC, GHG Protocol)
  • Track progress against the allocated quota by month, quarter, and year
  • Generate standardized inventory reports ready for third-party verification
  • Manage emissions data records transparently, with the entire history traceable

Rather than waiting until the pilot phase ends in 2028, businesses that become familiar with and operate well during the pilot phase will have a clear advantage - both in compliance and in cost optimization.

Start today

The quotas have been allocated. 2025 has been calculated. 2026 is under way.

If your facility does not yet have a systematic emissions inventory system, now is the time to start - before the pilot phase gives way to quota auctioning from 2029.

[Try EcoCheck for free] | [Contact us for implementation advice]

Reference sources: Decision No. 263/QD-TTg dated February 9, 2026 of the Prime Minister; Decree No. 119/2025/ND-CP.